Case Study – lake Memphremagog

Case Study – lake Memphremagog

The challenge Lac Memphremagog is very busy with boaters who come from all over Québec. There are sometimes more than 250 boats per day using the boat ramps. The risks of propagation by AIS are, therefore, high. Given the traffic, total washing time was an important...
CASE STUDY – RCM DES SOURCES

CASE STUDY – RCM DES SOURCES

The challenge The RCM des Sources, located in Estrie, was struggling with a watermilfoil problem in its main body of water, Trois-Lacs. The root cause of the problem is that in the past, no watercraft were washed before they were launched, so there was little...
case study – lac Etchemin

case study – lac Etchemin

The challenge Lac Etchemin is an important attraction for the municipality and its citizens. Protecting the lake from aquatic invasive species was therefore necessary for its preservation. This is why the Association du Club Nautique du Lac-Etchemin decided to install...