Project management at Eastman

by | Nov 15, 2021 | Case study

TURNKEY PROJECT FOR A STATIONARY WASHING STATION IN EASTMAN

The station includes a secondary road, a polishing/disposal field, a mast with a rotating washing arm, a structure to support boats without motors and stationary washing equipment.

The project included:

  • Development of a secondary road
  • Development of a polishing/disposal field
  • Installation of a washing mast with rotating washing arm
  • Manufacture of a support upon which decontaminate boats without engines
  • Installation of stationary washing equipment within an existing building

The entire project was tailor-made for the municipalities of Bolton-Est and Eastman by our team. We created the station design as well as managed the construction site and the tradespeople.

Related Posts

Case Study – lake Memphremagog

Case Study – lake Memphremagog

The challenge Lac Memphremagog is very busy with boaters who come from all over Québec. There are sometimes more than 250 boats per day using the boat ramps. The risks of propagation by AIS are, therefore, high. Given the traffic, total washing time was an important...

CASE STUDY – RCM DES SOURCES

CASE STUDY – RCM DES SOURCES

The challenge The RCM des Sources, located in Estrie, was struggling with a watermilfoil problem in its main body of water, Trois-Lacs. The root cause of the problem is that in the past, no watercraft were washed before they were launched, so there was little...