Project management at Eastman

by | Nov 15, 2021 | Case study, Project

TURNKEY PROJECT FOR A STATIONARY WASHING STATION IN EASTMAN

The station includes a secondary road, a polishing/disposal field, a mast with a rotating washing arm, a structure to support boats without motors and stationary washing equipment.

The project included:

  • Development of a secondary road
  • Development of a polishing/disposal field
  • Installation of a washing mast with rotating washing arm
  • Manufacture of a support upon which decontaminate boats without engines
  • Installation of stationary washing equipment within an existing building

The entire project was tailor-made for the municipalities of Bolton-Est and Eastman by our team. We created the station design as well as managed the construction site and the tradespeople.