Turnkey project for a fixed decontamination station in Eastman
The station includes a secondary road, a polishing field, a pole with a rotating boom, a structure to place kayaks and paddles and a fixed decontamination equipment.
The project includes:
- Construction of a secondary road
- Construction of a polishing field
- Installation of a decontamination pole with a rotating boom
- Construction of a rack to decontaminate motorless boats
- Installation of a fixed decontamination equipment in an existing building
The entire project was custom made for the municipalities of East Bolton and Eastman by our team. We created the plan of the station as well as managing the site and the work shifts.