TURNKEY PROJECT FOR A STATIONARY WASHING STATION IN EASTMAN
The station includes a secondary road, a polishing/disposal field, a mast with a rotating washing arm, a structure to support boats without motors and stationary washing equipment.
The project included:
- Development of a secondary road
- Development of a polishing/disposal field
- Installation of a washing mast with rotating washing arm
- Manufacture of a support upon which decontaminate boats without engines
- Installation of stationary washing equipment within an existing building
The entire project was tailor-made for the municipalities of Bolton-Est and Eastman by our team. We created the station design as well as managed the construction site and the tradespeople.
![](https://ozerosolutions.com/wp-content/uploads/2022/01/DJI_0247.jpg)
![](https://ozerosolutions.com/wp-content/uploads/2022/01/DJI_0251.jpg)
![](https://ozerosolutions.com/wp-content/uploads/2022/01/DJI_0259.jpg)
![](https://ozerosolutions.com/wp-content/uploads/2022/01/DJI_0264.jpg)
![](https://ozerosolutions.com/wp-content/uploads/2022/01/IMG_4108.jpg)
![](https://ozerosolutions.com/wp-content/uploads/2022/01/IMG_4115.jpg)